Shandong Meto Beer Equipment Company Ltd. – Beer production machine – 1000L/Brew Beer Brewing System

0,00

 

Technical  Sheet: 

 

  • Beer production system: 1,000 L/brew integrated brewing line for commercial beer production, covering the entire process from malt preparation to final packaging.

 

 

  • Main equipment included:
    • Malt Milling Unit (500 kg/h malt mill, pipe chain conveyor, grist case, grist hydrator)
    • 1,000 L three-vessel brewhouse with 2,000 L hot liquor tank (mash tank, lauter tun, kettle/whirlpool, pumps, heat exchanger, flow meters, hops backs, yeast dosing vessel, platform and piping)
    • 5 × 2,000 L fermentation tanks with double-stage glycol cooling
    • Glycol cooling system (3,000 L glycol tank, 2 glycol chillers, transfer pumps and piping)
    • Brewing System Control Cabinet with Siemens PLC and touchscreen control
    • Reverse Osmosis (RO) water treatment system (500 L/h) with 2,000 L water tank
    • PLC-controlled two-head keg washer (40-80 kegs/hour)
    • Bottle filling and capping line including cap lifter, bottle dryer, date coder and labeling machine
    • Automatic can filling and seaming machine
    • Beer filtration system
    • Spare parts and installation toolkit included

 

 

  • Power consumption specified in the proposal:
    • Malt mill motor: 1.5 kW
    • Pipe chain conveyor motor: 1.5 kW
    • Gas steam boiler auxiliaries (burner/water pump): 0.55 kW
    • Mash tank agitator: 1.5 kW
    • Lauter tun rake motor: 1.5 kW
    • 2 × glycol chillers: 5 kW each (10 kW total)
    • Bottle dryer fan: 7.5 kW

 

Out of stock

SKU: 4027 Category:
The item has been assessed for digitalization/automation

Description

 

Technical  Sheet: 

 

  • Beer production system: 1,000 L/brew integrated brewing line for commercial beer production, covering the entire process from malt preparation to final packaging.

 

 

  • Main equipment included:
    • Malt Milling Unit (500 kg/h malt mill, pipe chain conveyor, grist case, grist hydrator)
    • 1,000 L three-vessel brewhouse with 2,000 L hot liquor tank (mash tank, lauter tun, kettle/whirlpool, pumps, heat exchanger, flow meters, hops backs, yeast dosing vessel, platform and piping)
    • 5 × 2,000 L fermentation tanks with double-stage glycol cooling
    • Glycol cooling system (3,000 L glycol tank, 2 glycol chillers, transfer pumps and piping)
    • Brewing System Control Cabinet with Siemens PLC and touchscreen control
    • Reverse Osmosis (RO) water treatment system (500 L/h) with 2,000 L water tank
    • PLC-controlled two-head keg washer (40-80 kegs/hour)
    • Bottle filling and capping line including cap lifter, bottle dryer, date coder and labeling machine
    • Automatic can filling and seaming machine
    • Beer filtration system
    • Spare parts and installation toolkit included

 

 

  • Power consumption specified in the proposal:
    • Malt mill motor: 1.5 kW
    • Pipe chain conveyor motor: 1.5 kW
    • Gas steam boiler auxiliaries (burner/water pump): 0.55 kW
    • Mash tank agitator: 1.5 kW
    • Lauter tun rake motor: 1.5 kW
    • 2 × glycol chillers: 5 kW each (10 kW total)
    • Bottle dryer fan: 7.5 kW